The Pond at Latimer Heights is a 3-acre natural feature that serves multiple functions including stormwater management, wildlife habitat and park land.

- Excavation and removal of 50,000m3 of surplus soil
- Construction of 800 liner meters of reinforced cast-in-place walls
- Construction of pedestrian bridge
- Storm sewers including flow control weir manhole