- Removals of contaminated material.
- Road works including road widening, curbs sidewalk, RMA works, and paving.
- Re & Re of existing 900mm CMP pipe and install new 900mm HDPE pipe.
- Large by-pass system put in place to handle runoff water from Lougheed HWY and all drainage.
- Supply & Install watermain on a high density road.
- Installation of Hydro concrete duct bank, Telus and Shaw conduits.
- Completed work for two client’s side by side onsite to complete the project and keep both parties satisfied and happy.
- Assist with new pump station works at Beta Ave for City of Burnaby.
See similar projects

Oakridge Park
An incredible opportunity to bring our expertise in demolition and excavation to such a landmark project in Vancouver.
Learn more
Lumina Brentwood - 2425 Beta Ave
A dynamic project featuring the tag team efforts of our Civil and Environmental divisions.
Learn more
South Point Walk
A fun project demanding heavy earthworks and construction of access routes.
Learn more
Royal Colombian Hospital
Extensive management of the works was required due to the site being located within an existing operational healthcare campus.
Learn more