In preparation for the new Fraser Common development, Matcon was contracted to demolish the existing 6 storey hotel.

- Disposal and removal of all hazardous containing materials
- Develop engineered demolition plans
- Removal of all architectural finishes prior to demolition
- Demolition of the existing concrete structure with heavy equipment, including High Reach Excavator
- Removal of all footings and foundations
- Removal and disposal of underground storage tanks (incl. pumping out contaminated liquids)
- Periodic lane closure along Marine drive during critical demolition
- LEED Project – 98% of all materials were recycled/reused
- Slope cut perimeter and final rough grade of site
See similar projects

Oakridge Park
An incredible opportunity to bring our expertise in demolition and excavation to such a landmark project in Vancouver.
Learn more
Gateway Residences
A demolition, remediation and excavation project all in preperation for development.
Learn more
Lumina Brentwood - 2425 Beta Ave
A dynamic project featuring the tag team efforts of our Civil and Environmental divisions.
Learn more
1500 Robson
Retained to excavate and prep for development of a 127 unit multi residential tower.
Learn more