In preparation for the new Fraser Common development, Matcon was contracted to demolish the existing 6 storey hotel.

- Disposal and removal of all hazardous containing materials
- Develop engineered demolition plans
- Removal of all architectural finishes prior to demolition
- Demolition of the existing concrete structure with heavy equipment, including High Reach Excavator
- Removal of all footings and foundations
- Removal and disposal of underground storage tanks (incl. pumping out contaminated liquids)
- Periodic lane closure along Marine drive during critical demolition
- LEED Project – 98% of all materials were recycled/reused
- Slope cut perimeter and final rough grade of site
See similar projects

Oakridge Park
Incredible opportunity to bring our expertise in demolition and excavation to such a landmark project in Vancouver.
Learn more
1500 Robson
Retained to excavate and prep for development of a 127 unit multi residential tower.
Learn more
Richmond Centre
The demolition team was retained to remove an existing theatre and food court as well as manage and handle contaminated soil and asbestos abatement.
Learn more
King George Station
A multidisciplinary project requiring demolition, excavation and deep foundation all while protecting existing infrastructure and a vital transit corridor.
Learn more