This Project Involved:
• Deconstruct and Segregate 24,000MT stockpiled material into Hazardous Waste and Waste Quality;
• Chemical Stabilization of 9,500MT of Hazardous waste soil with leachable metals;
• Excavate, Load, Haul and Dispose 32,600MT of metals contaminated soil;